Managing hydrogeological risks in underground construction
Chalmers tekniska högskola.
Responsible organisation
2021 (Swedish)Licentiate thesis, comprehensive summary (Other academic)Alternative title
Hantering av hydrogeologiska risker i undermarksbyggande (English)
Abstract [sv]

Grundvattenläckage in i undermarkskonstruktioner kan orsaka grundvattensänkning och därmed kostsamma skador på objekt som påverkas av förändrade grundvattenförhållanden. För att minska skaderisken kan riskreducerande åtgärder genomföras. Vid genomförandet av åtgärder måste samhällets begränsade resurser användas på ett omsorgsfullt sätt genom att väga kostnaderna mot nyttan (t.ex. minskad risk) av åtgärderna. Beslut om riskreducerande åtgärder måste alltid fattas under osäkerhet, eftersom förhållandena i det hydrogeologiska systemet inte kan vara fullständigt kända. I denna avhandling presenteras ett generellt ramverk för hantering av hydrogeologiska risker i undermarksbyggande (artikel 1). Detta ramverk utgör ett strukturerat och transparent angreppssätt för beslutsprocessen kring införandet av riskreducerande åtgärder för grundvattenkontroll i undermarksbyggande. Ramverket använder ett stokastiskt och iterativt angreppssätt för att hantera den föränderliga osäkerhetsnivå som oundvikligen är förknippad med undermarksbyggande. De olika moduler som utgör ramverket illustreras också genom tillämpning i en fallstudie (artikel 2). Fallstudien fokuserar på risken för sättningsskador på den bebyggda miljön (byggnader, hårdgjorda ytor och ledningar) samt riskreducerande åtgärder i form av tätning, artificiell grundvattenbildning (infiltration) och förstärkningsåtgärder för byggnader. Ramverket och de metoder som används inom ramverket för riskanalys och riskvärdering har visat sig vara användbara som beslutsstöd för hantering av hydrogeologiska risker. Ramverket har också visat sig vara ett effektivt verktyg för kommunikation av risker, både internt inom ett projekt och mellan projektägare och samhällsaktörer.

Abstract [en]

Groundwater leakage into underground constructions can cause groundwater drawdown and subsequently costly damages to objects impacted by changes in groundwater conditions. In order to reduce the damage risk, risk-reducing measures can be implemented. When implementing measures, society’s limited resources must be carefully managed by balancing the costs and the benefits (e.g. reduced risk) of the measures. Decisions regarding risk-reducing measures must always be taken under uncertainty since the conditions of the hydrogeological system cannot be fully known. In this thesis, a generic framework for management of hydrogeological risks in underground construction is presented (Paper 1). This framework constitutes a structured and transparent approach to the decision process for implementation of risk-reducing measures for groundwater control in underground construction. The framework uses a stochastic and iterative approach for managing the changing level of uncertainty inevitably associated with underground construction. The different modules that constitute the framework are also exemplified by application in a case study (paper 2). The case study focuses on the risk of subsidence damages to the built-up environment (buildings, paved surfaces and pipes) and riskreducing measures in the form of sealing, artificial recharge and reinforcement measures to houses. The framework and methods used within the framework for the risk analysis and risk evaluation have proven useful as decision support for management of hydrogeological risks. The framework has also proven to be an efficient tool in communication of risks both internally in a project but also between the project owner and stakeholders in the society.

Place, publisher, year, edition, pages
Göteborg: Chalmers tekniska högskola , 2021. , p. 36
Series
Trafikverkets forskningsportföljer
Series
Technical report ; 2021:10
Keywords [en]
risk management; groundwater drawdown-induced damages; uncertainties; decision support; cost–benefit analysis
Keywords [sv]
Byggande, Bygga
National Category
Construction Management
Research subject
FOI-portföljer, Bygga
Identifiers
URN: urn:nbn:se:trafikverket:diva-22205OAI: oai:DiVA.org:trafikverket-22205DiVA, id: diva2:2061265
Projects
Samhällsekonomisk analys för rimlighetsbedömning av villkor för grundvattenbortledning
Funder
Swedish Transport Administration, TRV 2020/92852Available from: 2026-05-20 Created: 2026-05-20 Last updated: 2026-05-20Bibliographically approved

Open Access in DiVA

Managing hydrogeological risks in underground construction(1271 kB)40 downloads
File information
File name FULLTEXT01.pdfFile size 1271 kBChecksum SHA-512
1c51dde70d90bf37106f0aa095407990e01df8329b6c8654f3b87e6667faafa72c8798156e2726410023613d1bdd61f9873d4a8407dff2584c306d6da7ad4106
Type fulltextMimetype application/pdf

Other links

https://research.chalmers.se/publication/527333
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 185 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf