Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Availability target of the railway infrastructure: an analysis
Luleå tekniska universitet, Drift, underhåll och akustik.ORCID iD: 0000-0001-8111-6918
Luleå tekniska universitet, Drift, underhåll och akustik.
Responsible organisation
2010 (English)In: 2010 proceedings: Annual Reliability and Maintainability Symposium : San Jose, California, USA, 25 - 28 January 2010, Piscataway, NJ: IEEE Communications Society , 2010Conference paper, Published paper (Refereed)
Abstract [en]

The railway has been accepted as one of the most environmentally friendly modes of transport for goods and passengers. However, the railway sector is striving to increase its capacity to meet the growing demand for the transport of goods and passengers with a high level of punctuality in its services. Higher availability requires the effective operation and maintenance of infrastructure, often necessitating the implementation of cost-effective preventive maintenance strategies. Therefore, a higher availability target means higher maintenance investment. However, the question of setting the availability target for the infrastructure is not easy, as it involves many influencing decision parameters, apart from a good understanding of the network configuration and traffic density.

Railway networks that have a smaller number of trains and a low punctuality requirement do not require higher availability targets. The aim of this paper is to estimate the availability target for railway infrastructure based on the capacity and punctuality requirements of infrastructure managers and train operating companies.

The objectives of the paper are to develop an approach to i) estimating the capacity of the infrastructure based on the design and operational characteristics and evaluating the influence of infrastructure availability on the required capacity and ii) estimating the volume of primary and secondary delay due to failures and maintenance of the infrastructure and establishing the relationship between availability and punctuality requirements.

To achieve these objectives, an example is presented with parameters drawn from failure, maintenance and traffic data. Finally, a model has been developed in Petri-Nets to establish a relationship between availability, capacity and punctuality. Monte Carlo simulation is used to establish the relationship. The simulation results illustrate the effect of infrastructure availability on train delays and capacity.

Place, publisher, year, edition, pages
Piscataway, NJ: IEEE Communications Society , 2010.
Series
Trafikverkets forskningsportföljer
Keywords [en]
Railway Infrastructure, Reliability, Maintainability, Availability, Capacity, Punctuality
National Category
Other Civil Engineering
Research subject
FOI-portföljer, Äldre portföljer
Identifiers
URN: urn:nbn:se:trafikverket:diva-12477DOI: 10.1109/RAMS.2010.5448035Scopus ID: 2-s2.0-77952783591Local ID: 032e1b30-cadd-11de-b769-000ea68e967bISBN: 978-1-4244-5102-9 (print)OAI: oai:DiVA.org:trafikverket-12477DiVA, id: diva2:1824134
Conference
Annual Reliability and Maintainability Symposium : 25/01/2010 - 28/01/2010
Projects
JVTC
Funder
Swedish Transport Administration, TRV 2011/58769Available from: 2024-01-04 Created: 2024-01-04 Last updated: 2025-09-04

Open Access in DiVA

fulltext(235 kB)66 downloads
File information
File name FULLTEXT01.pdfFile size 235 kBChecksum SHA-512
e1f75e707b76cab9bc961d01d2a0d882514e10c90b17ad50b43cee41735eb07c79ac5cdc66ad0a46a6a569d46b69b5e4b4545731f68f5a2e5f8c0a79d6cdea10
Type fulltextMimetype application/pdf

Other links

Publisher's full textScopus

Authority records

Patra, Ambika PrasadKumar, UdayLarsson-Kråik, Per-Olof

Search in DiVA

By author/editor
Patra, Ambika PrasadKumar, UdayLarsson-Kråik, Per-Olof
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 68 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

doi
isbn
urn-nbn

Altmetric score

doi
isbn
urn-nbn
Total: 366 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf