This Deliverable D4.3.2 presents the results of the research carried out in task 4.3.4 of SP4 Advanced Monitoring - WP4.3 Implementation in new structures. The aim of this deliverable is to describe the specific design, installation process, testing protocol and test results from the monitoring system devised in previous tasks (and described in D4.3.1). Said system has been installed in the demonstrators for the new infrastructure concepts developed in SP1, which shall also be thoroughly described in the document.