Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
C4R D 5.3.3 Report on migration scenarios/paths for selected real sites/corridors
Responsible organisation
2016 (English)Report (Other academic)
Abstract [en]

This deliverable describes important aspects of migration and explain possible migration paths and cases for upgrading ballasted tracks on rail freight corridors (RFCs) by slab track developed in C4R. Upgrading the track on a highly loaded rail freight corridor, where the use of slab track make sense, is a very challenging task for migration. The basis for the decision are criteria like • Capacity bottleneck due to track availability and high maintenance • Availability of alternative routes • Proofed slab track available for given boundaries or • Homogeneous and stable support conditions

Place, publisher, year, edition, pages
UIC , 2016. , p. 20
Series
Trafikverkets forskningsportföljer
Keywords [en]
railway, migration, railway system, rail freight corridor, track
National Category
Infrastructure Engineering
Research subject
FOI-portföljer, Planera
Identifiers
URN: urn:nbn:se:trafikverket:diva-15900Archive number: TRV 2014/11598OAI: oai:DiVA.org:trafikverket-15900DiVA, id: diva2:1835368
Projects
Capacity4Rail
Funder
Swedish Transport Administration, TRV 2014/11598Available from: 2024-02-06 Created: 2024-02-06 Last updated: 2025-09-04Bibliographically approved

Open Access in DiVA

C4R D 5.3.3 Report on migration scenarios/paths for selected real sites/corridors(1085 kB)50 downloads
File information
File name FULLTEXT01.pdfFile size 1085 kBChecksum SHA-512
196ffb1aa988f52aba8c289db207ac4cdec69a72c19372921036532585ad7084668408e9baafb4d215c6defc08e56db7f9f26e5a44c15f4cb99d7e341c5c996e
Type fulltextMimetype application/pdf

Infrastructure Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 50 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 248 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf