Ändra sökning
Avgränsa sökresultatet
1 - 5 av 5
RefereraExporteraLänk till träfflistan
Permanent länk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Träffar per sida
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sortering
  • Standard (Relevans)
  • Författare A-Ö
  • Författare Ö-A
  • Titel A-Ö
  • Titel Ö-A
  • Publikationstyp A-Ö
  • Publikationstyp Ö-A
  • Äldst först
  • Nyast först
  • Skapad (Äldst först)
  • Skapad (Nyast först)
  • Senast uppdaterad (Äldst först)
  • Senast uppdaterad (Nyast först)
  • Disputationsdatum (tidigaste först)
  • Disputationsdatum (senaste först)
  • Standard (Relevans)
  • Författare A-Ö
  • Författare Ö-A
  • Titel A-Ö
  • Titel Ö-A
  • Publikationstyp A-Ö
  • Publikationstyp Ö-A
  • Äldst först
  • Nyast först
  • Skapad (Äldst först)
  • Skapad (Nyast först)
  • Senast uppdaterad (Äldst först)
  • Senast uppdaterad (Nyast först)
  • Disputationsdatum (tidigaste först)
  • Disputationsdatum (senaste först)
Markera
Maxantalet träffar du kan exportera från sökgränssnittet är 250. Vid större uttag använd dig av utsökningar.
  • 1.
    Lidén, Tomas
    Linköpings universitet, Kommunikations- och transportsystem.
    STAPLA-F research report. Version 32019Rapport (Övrigt vetenskapligt)
    Abstract [en]

    This research report documents the findings from the pre-study project STAPLA-F, conducted by Linköping University and Trafikverket via the research program KAJT. The purpose has been to investigate how strategic facility planning for balancing of maintenance and train traffic could be done, especially regarding switches and crossings (S&C). The project has also investigated the potentials for network simplifications and the removal of (redundant) S&C. Specifically, the station Katrineholm have been used as a case study.

    The results show that the economic potential for reducing the S&C maintenance spending can be in the range of 10% for midsize and larger stations, which translates to 70-80 MSEK per year, and that net traffic delays can be reduced by removal of redundant S&C. Furthermore, this is an interesting research problem, which has not yet been addressed in the research literature. Hence, it is recommended to continue with a PhD research project.

    Ladda ner fulltext (pdf)
    FULLTEXT01
  • 2.
    Lidén, Tomas
    et al.
    Statens väg- och transportforskningsinstitut, Trafikanalys och logistik, TAL.
    Aronsson, Martin
    RISE.
    Liu, Chengxi
    Statens väg- och transportforskningsinstitut, Trafikanalys och logistik, TAL.
    Samplanering av trafikpåverkande åtgärder och trafikflöden, modellstudie: Delrapport 1 – Krav- och behovsinventering2021Rapport (Övrigt vetenskapligt)
    Abstract [sv]

    Den långsiktiga nationella infrastrukturplaneringen behöver beakta hur investerings- och underhålls-åtgärder planeras både utifrån projektens genomförbarhet och trafikens påverkan, men det saknas idag kvantitativa metoder som kan ge ett sådant stöd i banarbetsplaneringen. Forskningsprojektet SATT (Samplanering av trafikpåverkande åtgärder och trafikflöden, modellstudie) har syftat till att ta fram en metod för att kunna optimera den långsiktiga schemaläggningen av större banarbeten utifrån såväl projektens genomförbarhet som trafikens framkomlighet. Som grund för detta har en översikt av förutsättningarna för den långsiktiga banarbetsplaneringen genomförts tillsammans med en litteraturstudie av vilka angreppssätt som förekommer i forskningslitteraturen. I samarbete med Trafikverket har sedan funktionella krav och behov inventerats och analyserats, med fokus på den ekonomiska planering som görs för ett specifikt produktionsår. Denna delrapport dokumenterar resultaten från litteraturstudien samt krav- och behovsanalysen.

    Ladda ner fulltext (pdf)
    Samplanering av trafikpåverkande åtgärder och trafikflöden, modellstudie
  • 3.
    Lidén, Tomas
    et al.
    Statens väg- och transportforskningsinstitut.
    Joborn, Martin
    RISE Research Institutes of Sweden.
    Gestrelius, Sara
    RISE Research Institutes of Sweden.
    Rubio, Javier Monje
    Indra.
    Gonzáles, Enrique Gómez
    Indra.
    Häll, Carl Henrik
    Linköpings universitet.
    Peterson, Anders
    Linköpings universitet.
    Schmidt, Christiane
    Linköpings universitet.
    Minbashi, Niloofar
    KTH.
    Sipälä, Hans
    KTH.
    Wahlborg, Magnus
    Trafikverket.
    Demonstration of enhanced and integrated line- and yard planning and possibilities for implementation2023Rapport (Övrigt vetenskapligt)
    Abstract [en]

    This document constitutes Deliverable D2.3 of the project FR8RAIL III Work Package (WP) 2 “Real-Time Network Management” within the framework of the Technology Demonstrator - TD5.2 “Digital Transport Management” of IP5 “Technologies for Sustainable & Attractive European Rail Freight” in Shift2Rail. The report documents the conducted work and results from task T2.3 and is the final deliverable from WP2. 

    Three methods and tools have been developed, analysed, and demonstrated on real-world operational data. These tools address three different but equally important aspects for improving the efficiency of real-time network management of railways and contribute to closing the gap between planning and operations by enabling the traffic management to have a more proactive way of working . The focus of the work is on the coordination of freight operations at lines and marshalling yards, namely: • Coordination of all operational activities taking place at arrival/departure yards. • Replanning of timetables for line traffic. • Prediction of system effects and the combined operations of yards and lines. 

    Firstly, an integrated demonstration platform for planning operational activities at a marshalling yard is studied. The developed Yard Coordination System (YCS) itself is described as well as how it has been applied and demonstrated in a workshop with experienced participants from the three principally involved stakeholders. The demonstration has shown that a tool like YCS can improve transparency and enable cooperative and pro-active planning. The practitioners reckoned that the tool could prevent and alleviate departure delays, and they expressed a strong wish for continued development of such support. An extensive list of experiences, development suggestions, potentials and risks are reported. 

    Secondly, a timetable modification module (TIMO) for short-term replanning of line traffic is evaluated. The method uses a heuristic approach that aims at achieving a high bottleneck robustness, which together with algorithm runtime and several other criteria (train path deviation, change in departure time etc) are used in the evaluation. The effect of several parameters in TIMO are studied, such as iteration settings, size of allowed time windows and share of other train paths that may be adjusted—both for peak and off-peak traffic. Furthermore, how TIMO can be used in an iterative procedure to solve the replanning problem on the line in case of ad-hoc maintenance at the departure marshalling yard is demonstrated. The results show that TIMO’s performance depends greatly on various parameter settings, which delimits the (current) use cases for TIMO. 

    Thirdly, a proof-of-concept model framework for increasing the predictability of yard departures and arrivals is evaluated. The model framework incorporates a machine learning-based yard departure deviation prediction model (YPM) into a macroscopic network simulation model (Proton).  Both the infrastructure manager and the yard operator can benefit from this model framework; the former by getting a more realistic picture of the train that runs along the line, the latter by improved yard arrival estimations.  Finally, the possibilities for real-time usage of these methods and tools are discussed along with their respective impact on the three system level performance indicators load factor, punctuality and average (transportation) speed. 

    Ladda ner fulltext (pdf)
    fulltext
  • 4.
    Liu, Chengxi
    et al.
    Statens väg- och transportforskningsinstitut, Trafikanalys och logistik, TAL.
    Lidén, Tomas
    Statens väg- och transportforskningsinstitut, Trafikanalys och logistik, TAL.
    Dynamic traffic assignment for railway: the 4th report in the project Joint planning of temporary capacity restrictions and railway traffic flow, a model study2021Rapport (Övrigt vetenskapligt)
    Abstract [sv]

    I forskningsprojektet SATT (Samplanering av trafikpåverkande åtgärder och trafikflöden, modellstudie) har en dynamisk trafiktilldelningsmetod (Dynamic Traffic Assignment, DTA) anpassats för att kunna simulera järnvägstrafik. Detta erbjuder ett alternativ till tidtabellsplanering. Till skillnad från flödesoptimering, simulerar DTA tågrörelser med en hög detaljeringsgrad (ner på sekundnivå) men kan ändå hantera stora trafikmängder med en rimlig beräkningstid. Metoden strävar däremot inte efter ett systemoptimum utan söker efter en jämviktslösning där inget enskilt tåg kan hitta alternativa vägar som förbättrar dess restid eller generaliserade kostnad. Denna jämviktslösning brukar benämnas som dynamisk användarjämvikt. 

    Denna rapport redovisar ett förslag på hur transportsimuleringsplattformen MATSim kan anpassas och användas för att göra dynamisk trafiktilldelning för järnvägstrafik, utan något krav på en känd tidtabell. Anpassningen inkluderar simulering av tågtrafik på enkelspårs-sträckor, hantering av tillfälliga kapacitetsreduktioner (motsvarande så kallade trafikpåverkande åtgärder, TPÅ), och olika tågtyper. Metoden har testats och utvärderats med hjälp av två små exempelfall. Resultaten visar att modellen ger realistisk hantering av tågtrafiken och dess förmåga att finna en rimlig tågplan baserat på en enkel värderingsfunktion. Fortsatt arbete bör inriktas på förfining av modellen och applicering på ett storskaligt nationellt nätverk.

    Ladda ner fulltext (pdf)
    Dynamic traffic assignment for railway
  • 5.
    Odolinski, Kristofer
    et al.
    Statens väg- och transportforskningsinstitut, Transportekonomi, TEK.
    Lidén, Tomas
    Statens väg- och transportforskningsinstitut, Trafikanalys och logistik, TAL.
    Railway line capacity utilisation and its impact on renewal costs2021Rapport (Övrigt vetenskapligt)
    Abstract [en]

    In this paper we estimate the impact of line capacity utilisation on the marginal cost of rail infrastructure renewals. Previous studies are mainly concerned with deterioration costs caused by traffic. This paper contributes to the literature, showing that increased line capacity utilisation can – in addition to higher deterioration costs – generate increased costs for carrying out a renewal project and/or more frequent renewals, where the latter can be motivated by efforts to curb expected delays. A top-down econometric approach is used on a Swedish dataset comprising information on renewal costs for track, electric installations, signalling, telecommunication, and other installations such as barriers, fencing and lubrication equipment. The results are relevant for rail infrastructure managers, especially in Europe where directives by the EU stipulate that track access charges are to be based on direct costs in order to contribute to an efficient use of the infrastructure.

    Ladda ner fulltext (pdf)
    FULLTEXT01
1 - 5 av 5
RefereraExporteraLänk till träfflistan
Permanent länk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf