Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
C4R D 4.2.1 Requirements for Next generation Monitoring and Inspection
Responsible organisation
2015 (English)Report (Other academic)
Abstract [en]

This report is the first deliverable for Work Package 4.2 under Sub- Project 4 (SP4) of the Capacity4Rail project. The aim of this deliverable is to set out the basis for the selection of the most suitable components of the monitoring system, such as devices, methods and tools, to be integrated in upgraded and new infrastructure elements leading to the achievement of the general goals of the Capacity4Rail project, i.e. the design and development of an affordable, adaptable, automated, resilient and high capacity railway system. First of all, a set of functional and technical requirements at low level, mid level and high level has been defined. Once scored, the features of the monitoring components can be assessed together with their cost in an evaluation framework (spreadsheet) developed to this end, giving the best value to the solution that better meets the functional and technical requirements at minimum cost. This methodology will be helpful in the work to be done in Tasks 4.2.2 and 4.2.3, in charge of the selection of sensor, energy harvesting, communication and data integration technologies.

Place, publisher, year, edition, pages
C4R , 2015. , p. 53
Series
Trafikverkets forskningsportföljer
Keywords [sv]
järnvägsspår, underhåll, inspektion
National Category
Infrastructure Engineering
Research subject
FOI-portföljer, Planera
Identifiers
URN: urn:nbn:se:trafikverket:diva-15843Archive number: TRV 2014/11598OAI: oai:DiVA.org:trafikverket-15843DiVA, id: diva2:1835310
Projects
Capacity4Rail
Funder
Swedish Transport Administration, TRV 2014/11598Available from: 2024-02-06 Created: 2024-02-06Bibliographically approved

Open Access in DiVA

C4R D 4.2.1 Requirements for Next generation Monitoring and Inspection(1583 kB)25 downloads
File information
File name FULLTEXT01.pdfFile size 1583 kBChecksum SHA-512
eeab431a5b1fc22dac20b8a089c33ed30d878113fc36f205d22a4922d1cf7598cb6a5b8901731c4a923df8eb7b5ca26bd89c4cad86c635b663fe9b700ba1e86e
Type fulltextMimetype application/pdf

Infrastructure Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 25 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 178 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf