Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Performance based railway infrastructure maintenance: Towards achieving maintenance objectives
Luleå tekniska universitet, Drift, underhåll och akustik.ORCID iD: 0000-0001-9843-5819
Luleå tekniska universitet, Drift, underhåll och akustik.
Luleå tekniska universitet, Drift, underhåll och akustik.ORCID iD: 0000-0001-8111-6918
Responsible organisation
2011 (English)In: MPMM 2011: Maintenance Performance Measurement & Management: Conference Proceedings / [ed] Diego Galar; Aditya Parida; Håkan Schunnesson; Uday Kumar, Luleå: Luleå tekniska universitet , 2011, p. 233-240Conference paper, Published paper (Refereed)
Abstract [en]

The measurement and management of railway infrastructure capacity has received increased attention in recent years due to the pressing need to optimally utilized the existing railway infrastructure capacity and as well create more capacity. In a bid to improve the maintenance function and utilization of the existing infrastructure, some of the infrastructure managers (IM) reviewed their approach to outsourcing of maintenance functions, giving larger responsibilities to maintenance agent called contractors. The growing responsibilities of the contractors are however resisted by some IM due to some unresolved doubts. This paper discusses the outcome oriented approach to maintenance outsourcing; performance based railway infrastructure maintenance contracting with its issues and challenges. A framework is described and performance monitoring tool is proposed to enhance Performance Based Railway Infrastructure Maintenance (PBRIM) contracting as a strategy for improving the effectiveness of maintenance function

Place, publisher, year, edition, pages
Luleå: Luleå tekniska universitet , 2011. p. 233-240
Series
Trafikverkets forskningsportföljer
Keywords [en]
outsourcing, performance based railway infrastructure maintenance, input, output and outcome measures.
National Category
Other Civil Engineering
Research subject
FOI-portföljer, Äldre portföljer
Identifiers
URN: urn:nbn:se:trafikverket:diva-12504Local ID: aec5cd9b-8770-4837-a5f8-1dba0f470f21ISBN: 978-91-7439-379-8 (print)OAI: oai:DiVA.org:trafikverket-12504DiVA, id: diva2:1824404
Conference
International Conference on Maintenance Performance Measurement & Management : MPM² 13/12/2011 - 15/12/2011
Projects
JVTC
Funder
Swedish Transport Administration, TRV 2011/58769Available from: 2024-01-05 Created: 2024-01-05 Last updated: 2024-01-05

Open Access in DiVA

fulltext(326 kB)77 downloads
File information
File name FULLTEXT01.pdfFile size 326 kBChecksum SHA-512
1705286415893199d5aebc8751e51be5d7fd2ef87af7375769d348ef823fd495f5cea3756749b11db04e9a4ca7e443603dcaa0009180cffc562ed72aaf628c71
Type fulltextMimetype application/pdf

Authority records

Famurewa, Stephen MayowaJuntti, UllaKumar, Uday

Search in DiVA

By author/editor
Famurewa, Stephen MayowaJuntti, UllaKumar, Uday
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 77 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

isbn
urn-nbn

Altmetric score

isbn
urn-nbn
Total: 423 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf