The aim of this deliverable is to point out interim milestones that are necessary to achieve step changes in railway capacity and performance for passengers and freight. The report will summarize the results that were achieved in the project. It will try to answer “What will an adaptable, automated, resilient and high-capacity railway look like and how to pave the way?”