Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Tider i spår för underhållsarbeten
Statens väg- och transportforskningsinstitut, Drift och underhåll, DOU.ORCID iD: 0000-0001-8715-9767
Responsible organisation
2020 (Swedish)Report (Other academic)Alternative title
Track possession time for maintenance work (English)
Abstract [sv]

Tid i spåret för banarbete (dvs. disptid) är starkt kopplad till underhålls- och kapacitetsaspekter vilket kräver en planeringsprocess som sammankopplar såväl underhållsverksamhetens som tågtrafikens behov av tider i spåret. Underhållsverksamhetens tidsbehov och omfattning uppvisar stora variationer för olika typer av underhållsåtgärder och är inte lika entydig som tågtrafikens tidsbehov.

Syftet med projektet är att studera vilken tid i spåret (disptid/banarbetstid) som behövs för att genomföra olika typer av underhållsåtgärder i anläggningen. De åtgärdskategorier som projektet fokuserar på är spårbyte, rälsbyte, spårväxelbyte samt kontaktledningsbyte. Målet på kort sikt är att ta fram relevant underlag med avseende på tidsbehovet i spåret för genomförandet av underhållsåtgärder. Möjligheten att skapa nödvändigt utrymme för underhållsåtgärder kräver förståelse för kopplingen mellan bland annat tidsbehovet för olika underhållsåtgärder, underhållskvalitet, arbetsmiljö och tidtabellsplanering. Detta kan sedan ligga till grund för gemensamma diskussioner mellan beställare, tågoperatörer och underhållsentreprenörer om hur en process och/eller affärsmodell som är gynnsam för alla parter kan utvecklas.

Abstract [en]

The allocation of time for performing engineering works (track possession time) is strongly linked to maintenance and capacity aspects and demands a planning process that links the needs of maintenance companies and train operators for time on the line. The scope and time required for maintenance operations varies greatly depending on the type of maintenance measure being performed, making it less clear-cut than the timetabled requirements of train services.

The purpose of this project is to study how much track possession time is required to perform various types of maintenance measures on rail infrastructure. The categories of measures on which the project focuses are track replacement; rail replacement; switch replacement and overhead line replacement. The short-term aim is to develop relevant documentation regarding the necessary track possession time for the implementation of maintenance measures. The ability to create the necessary space for maintenance operations is dependent on an understanding of the links between parameters such as the time required to perform a given maintenance measure, the quality of maintenance, work environment and timetabling. This can then be used as the basis for joint discussions between clients, train operators and maintenance contractors regarding how a process or business model that is beneficial to all parties might be developed.

Place, publisher, year, edition, pages
Linköping: Statens väg- och transportforskningsinstitut , 2020. , p. 52
Series
Trafikverkets forskningsportföljer
National Category
Transport Systems and Logistics
Research subject
FOI-portföljer, Planera
Identifiers
URN: urn:nbn:se:trafikverket:diva-5656OAI: oai:DiVA.org:trafikverket-5656DiVA, id: diva2:1706679
Projects
Tid för underhållsåtgärder i spår (schablontider)
Funder
Swedish Transport Administration, TRV 2018/101966Available from: 2022-10-27 Created: 2022-10-27 Last updated: 2022-10-27

Open Access in DiVA

fulltext(5934 kB)173 downloads
File information
File name FULLTEXT01.pdfFile size 5934 kBChecksum SHA-512
4525632e2b27c09eda14028e3da2919258643abd6146e3c167c11479e7bc67c5fe5ae956d92a530ebae79ac24cd3901e6bbdb2bc1f78526969cc9c2c5efb6595
Type fulltextMimetype application/pdf

Authority records

Hedström, Ragnar

Search in DiVA

By author/editor
Hedström, Ragnar
Transport Systems and Logistics

Search outside of DiVA

GoogleGoogle Scholar
Total: 173 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 317 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf