Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Two-Level Multi-Objective Genetic Algorithm for Risk-Based Life Cycle Cost Analysis
Luleå tekniska universitet, Drift, underhåll och akustik.ORCID iD: 0000-0002-1967-6604
Responsible organisation
2019 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

Artificial intelligence (AI) is one of the fields in science and engineering and encompasses a wide variety of subfields, ranging from general areas (learning and perception) to specific topics, such as mathematical theorems. AI and, specifically, multi-objective genetic algorithms (MOGAs) for risk-based life cycle cost (LCC) analysis should be performed to estimate the optimal replacement time of tunnel fan systems, with a view towards reducing the ownership cost and the risk cost and increasing company profitability from an economic point of view. MOGA can create systems that are capable of solving problems that AI and LCC analyses cannot accomplish alone.

The purpose of this thesis is to develop a two-level MOGA method for optimizing the replacement time of reparable system. MOGA should be useful for machinery in general and specifically for reparable system. This objective will be achieved by developing a system that includes a smart combination of techniques by integrating MOGA to yield the optimized replacement time. Another measure to achieve this purpose is implementing MOGA in clustering and imputing missing data to obtain cost data, which could help to provide proper data to forecast cost data for optimization and to identify the optimal replacement time.

In the first stage, a two-level MOGA is proposed to optimize clustering to reduce and impute missing cost data. Level one uses a MOGA based on fuzzy c-means to cluster cost data objects based on three main indices. The first is cluster centre outliers; the second is the compactness and separation ( ) of the data points and cluster centres; the third is the intensity of data points belonging to the derived clusters. Level two uses MOGA to impute the missing cost data by using a valid data period from that are reduced data in size. In the second stage, a two-level MOGA is proposed to optimize time series forecasting. Level one implements MOGA based on either an autoregressive integrated moving average (ARIMA) model or a dynamic regression (DR) model. Level two utilizes a MOGA based on different forecasting error rates to identify proper forecasting. These models are applied to simulated data for evaluation since there is no control of the influenced parameters in all of the real cost data. In the final stage, a two-level MOGA is employed to optimize risk-based LCC analysis to find the optimal replacement time for reparable system. Level one uses a MOGA based on a risk model to provide a variation of risk percentages, while level two uses a MOGA based on an LCC model to estimate the optimal reparable system replacement time.

The results of the first stage show the best cluster centre optimization for data clustering with low  and high intensity. Three cluster centres were selected because these centres have a geometry that is suitable for the highest data reduction of 27%. The best optimized interval is used for imputing missing data. The results of the second stage show the drawbacks of time series forecasting using a MOGA based on the DR model. The MOGA based on the ARIMA model yields better forecasting results. The results of the final stage show the drawbacks of the MOGA based on a risk-based LCC model regarding its estimation. However, the risk-based LCC model offers the possibility of optimizing the replacement schedule.

However, MOGA is highly promising for allowing optimization compared with other methods that were investigated in the present thesis.

Place, publisher, year, edition, pages
Luleå: Luleå University of Technology , 2019. , p. 141
Series
Trafikverkets forskningsportföljer
Keywords [en]
Artificial intelligence (AI), Life cycle cost (LCC), Machine learning (ML), Multi-objective genetic algorithm (MOGA), Risk-based life cycle cost (LCC), Tunnel fans, Two-level system.
National Category
Computer Sciences Reliability and Maintenance Other Civil Engineering
Research subject
FOI-portföljer, Äldre portföljer
Identifiers
URN: urn:nbn:se:trafikverket:diva-5576ISBN: 978-91-7790-454-0 (print)ISBN: 978-91-7790-455-7 (electronic)OAI: oai:DiVA.org:trafikverket-5576DiVA, id: diva2:1701285
Public defence
2019-12-06, F1031, Lulea, Porsön, 10:00 (English)
Opponent
Supervisors
Projects
LCC-metodik med koppling till Maximo
Funder
Swedish Transport Administration, TRV 2016/10828Available from: 2022-11-01 Created: 2022-10-05 Last updated: 2022-11-01Bibliographically approved

Open Access in DiVA

fulltext(17217 kB)134 downloads
File information
File name FULLTEXT01.pdfFile size 17217 kBChecksum SHA-512
42af4748573f033ecafd6edd099814be39901740e6f7b29b98349d61e4fbc3f5fc562a3aee64ff871998ecd7cb898027eb5c7b141bcace2e09bbe20ba91ef353
Type fulltextMimetype application/pdf

Authority records

Al-Douri, Yamur

Search in DiVA

By author/editor
Al-Douri, Yamur
Computer SciencesReliability and MaintenanceOther Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 134 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

isbn
urn-nbn

Altmetric score

isbn
urn-nbn
Total: 643 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf