Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Principdiskussion kring LCC-kalkyler för väginvesteringar
Statens väg- och transportforskningsinstitut, Transportekonomi, TEK.
Statens väg- och transportforskningsinstitut, Transportekonomi, TEK.ORCID iD: 0000-0001-7976-5628
Responsible organisation
2017 (Swedish)Report (Other academic)Alternative title
Analysis of LCC principles for road investments (English)
Abstract [sv]

I detta projekt studerar vi hur Trafikverket principiellt bör förhålla sig till LCC-kalkyl i sin verksamhet med speciellt fokus på väginvesteringar. Grunden för den principiella analysen utgörs av kalkylmetodiken och dess likheter och skillnader med samhällsekonomisk kalkyl (CBA) som länge varit en viktig del av Trafikverkets beslutsunderlag vid åtgärdsval.

Tre viktiga observationer har gjorts i studien. Den första är den övergripande iakttagelsen att LCC-kalkyl bör betraktas som ett komplement till samhällsekonomiska kalkyler men användas främst på en mer detaljerad nivå för att välja mellan olika tekniska lösningar. Olika slags LCC-bedömningar kan därför ligga till grund för val av lösningar i alla skeden av bedömningar: förstudier, vägutredningar och projektering, och därmed med olika grad av detaljering. Det innebär att LCC-kalkyl kan och bör betraktas som ett beslutsunderlag för att genomföra en åtgärd med en given funktion kostnadseffektivt, det vill säga minimera kostnaden över livscykeln.

Vidare är en ytterligare observation att det kan finnas en risk att det optimala underhållet inte blir gjort, dels för att det saknas resurser för underhåll, men även på grund av att investeringsåtgärder genomförs med en annan pengapåse än underhållsåtgärder med anledning av politiska prioriteringar. Det kan även vara så att det är budgetförfarandet inom en organisation som gör det problematiskt med en optimering över hela livscykeln. Detta är organisatoriska frågor som bara kan lösas av regeringen eller inom Trafikverket med direktiv rörande vilka investeringar som ska genomföras och vilka beslutsunderlag som skall finnas. 

Dessutom är det observerat i vår studie att det metodmässigt kan skilja sig mellan LCC-kalkyl och samhällsekonomiska kalkyler beträffande trafikantkostnader vid trafikstörningar i samband med framtida underhåll. Vår uppfattning är att dessa trafikantkostnader bör ingå i en LCC-kalkyl och påvisar samma iakttagelser som Eriksson och Edelman (2014), nämligen att en stor trafikmängd gör att åtgärdsalternativ med ett lågt underhållsbehov generellt får en lägre relativ livscykelkostnad.

Slutligen blir rekommendationen att LCC-kalkyler har en viktig roll att spela inom Trafikverket när det kommer till att genomföra åtgärder på ett kostnadseffektivt sätt. Det är emellertid viktigt att kalkylmetodiken utvecklas och, framför allt, att de organisatoriska hindren för kostnadseffektiva åtgärdsval undanröjs.

Abstract [en]

In the current study, we analyze how the Swedish Transport Administration (STA) should involve LCC analysis in their activities regarding road investments. The basis for the study is the LCC analysis and its similarities and differences compared to cost-benefit analysis (CBA), where the latter for a long time has been an important part of STA’s decision basis for infrastructure measures.

We have made three important observations in our analysis. First, a generic observation is that LCC analysis should be used as a complement to CBA but preferably on a more detailed level to choose between different technical solutions. This implies that LCC analysis may, and should, be treated as a decision basis to conduct measures with a given operational function in an efficient way.

Furthermore, another observation is the risk for not conducting the efficient amount of maintenance, partly due to the lack of resources, but also since the maintenance measures and infrastructureinvestment measures are based on different, politically decided, budget constraints. Also, the budget process within the organization makes it difficult to optimize for the complete life cycle. Both these issues are organizational, that only can be solved on the governmental level or within STA with directions regarding the investment measures to conduct and which decision basis to rely on.

In addition, we have observed methodological differences between LCC analysis and CBA considering the road-user costs in connection to disturbances of planned road maintenance. Our view is that these costs should be included in an LCC analysis and our analyze confirm the observation of Eriksson and Edelman (2014), namely that a relatively high traffic volume leads to that measures with a small maintenance requirement in the future in general will have a lower life cycle cost.

Finally, our recommendation is that LCC analysis has an important role within STA when aiming for efficient design of infrastructure measures. However, it is of importance to develop the LCC methods and, especially, eliminate the organizational barriers for implementing LCC as a way for efficient measures

Place, publisher, year, edition, pages
Linköping: Statens väg- och transportforskningsinstitut , 2017. , p. 33
Series
Trafikverkets forskningsportföljer
Keywords [en]
Life cycle, Cost, Lifetime, Calculation, Method, Road construction, Transport infrastructure, Investment, Construction, Cost benefit analysis
National Category
Public Administration Studies
Research subject
FOI-portföljer, Bygga
Identifiers
URN: urn:nbn:se:trafikverket:diva-5455OAI: oai:DiVA.org:trafikverket-5455DiVA, id: diva2:1694870
Projects
Livscykelperspektiv på Investeringsbedömningar
Funder
Swedish Transport Administration, TRV 2016/89529Available from: 2022-09-12 Created: 2022-09-12 Last updated: 2022-09-12

Open Access in DiVA

fulltext(1505 kB)75 downloads
File information
File name FULLTEXT01.pdfFile size 1505 kBChecksum SHA-512
9b65bc47f431215b9fbc6cc43fba3e57c12f9331f39f9bb2e69e17eca60e8102cb8426914c3595017aa1aaacfaa2f89a2c8a78b5638c318ae6423165f7b4769a
Type fulltextMimetype application/pdf

Authority records

Swärdh, Jan-ErikPyddoke, Roger

Search in DiVA

By author/editor
Swärdh, Jan-ErikPyddoke, Roger
Public Administration Studies

Search outside of DiVA

GoogleGoogle Scholar
Total: 75 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 272 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf