The Swedish Transport Administration has been commissioned by the Government to investigate the requirements of increased railway capacity up until 2050. The findings of the investigation shall be reported in their entirety by 30 April 2012. An interim report on increased capacity within the railway system for the period 2012-2021 was submitted on 30 September 2011. This is a summary of the interim report.