Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Demonstration of enhanced and integrated line- and yard planning and possibilities for implementation
Statens väg- och transportforskningsinstitut.ORCID-id: 0000-0002-1643-6365
RISE Research Institutes of Sweden.ORCID-id: 0000-0003-3138-7503
RISE Research Institutes of Sweden.ORCID-id: 0000-0003-4456-9453
Indra.
Vise andre og tillknytning
Ansvarlig organisasjon
2023 (engelsk)Rapport (Annet vitenskapelig)
Abstract [en]

This document constitutes Deliverable D2.3 of the project FR8RAIL III Work Package (WP) 2 “Real-Time Network Management” within the framework of the Technology Demonstrator - TD5.2 “Digital Transport Management” of IP5 “Technologies for Sustainable & Attractive European Rail Freight” in Shift2Rail. The report documents the conducted work and results from task T2.3 and is the final deliverable from WP2. 

Three methods and tools have been developed, analysed, and demonstrated on real-world operational data. These tools address three different but equally important aspects for improving the efficiency of real-time network management of railways and contribute to closing the gap between planning and operations by enabling the traffic management to have a more proactive way of working . The focus of the work is on the coordination of freight operations at lines and marshalling yards, namely: • Coordination of all operational activities taking place at arrival/departure yards. • Replanning of timetables for line traffic. • Prediction of system effects and the combined operations of yards and lines. 

Firstly, an integrated demonstration platform for planning operational activities at a marshalling yard is studied. The developed Yard Coordination System (YCS) itself is described as well as how it has been applied and demonstrated in a workshop with experienced participants from the three principally involved stakeholders. The demonstration has shown that a tool like YCS can improve transparency and enable cooperative and pro-active planning. The practitioners reckoned that the tool could prevent and alleviate departure delays, and they expressed a strong wish for continued development of such support. An extensive list of experiences, development suggestions, potentials and risks are reported. 

Secondly, a timetable modification module (TIMO) for short-term replanning of line traffic is evaluated. The method uses a heuristic approach that aims at achieving a high bottleneck robustness, which together with algorithm runtime and several other criteria (train path deviation, change in departure time etc) are used in the evaluation. The effect of several parameters in TIMO are studied, such as iteration settings, size of allowed time windows and share of other train paths that may be adjusted—both for peak and off-peak traffic. Furthermore, how TIMO can be used in an iterative procedure to solve the replanning problem on the line in case of ad-hoc maintenance at the departure marshalling yard is demonstrated. The results show that TIMO’s performance depends greatly on various parameter settings, which delimits the (current) use cases for TIMO. 

Thirdly, a proof-of-concept model framework for increasing the predictability of yard departures and arrivals is evaluated. The model framework incorporates a machine learning-based yard departure deviation prediction model (YPM) into a macroscopic network simulation model (Proton).  Both the infrastructure manager and the yard operator can benefit from this model framework; the former by getting a more realistic picture of the train that runs along the line, the latter by improved yard arrival estimations.  Finally, the possibilities for real-time usage of these methods and tools are discussed along with their respective impact on the three system level performance indicators load factor, punctuality and average (transportation) speed. 

sted, utgiver, år, opplag, sider
2023. , s. 101
Serie
Trafikverkets forskningsportföljer
Emneord [sv]
gods, IP5, järnväg, Shift2Rail
HSV kategori
Forskningsprogram
FOI-portföljer, Europeiskt/Svenskt samarbete inom järnväg
Identifikatorer
URN: urn:nbn:se:trafikverket:diva-15990OAI: oai:DiVA.org:trafikverket-15990DiVA, id: diva2:1850492
Prosjekter
FR8RAIL III
Forskningsfinansiär
Swedish Transport Administration, TRV 2019/7622Tilgjengelig fra: 2024-04-10 Laget: 2024-04-10 Sist oppdatert: 2024-04-11

Open Access i DiVA

fulltext(5977 kB)130 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 5977 kBChecksum SHA-512
689c8abf95ef6bfdc159053ed9b1b17c12e6f65712861794fca9ab0835a890b88132a727e3e57c18a7e905a014be073a0e65670565141786c4cbe824eb3574e0
Type fulltextMimetype application/pdf

Søk i DiVA

Av forfatter/redaktør
Lidén, TomasJoborn, MartinGestrelius, SaraHäll, Carl HenrikPeterson, AndersSchmidt, ChristianeMinbashi, NiloofarSipälä, Hans
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 130 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 289 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
v. 2.45.0