Odolinski, K. & Lidén, T. (2021). Railway line capacity utilisation and its impact on renewal costs. Stockholm: VTI
Open this publication in new window or tab >>Railway line capacity utilisation and its impact on renewal costs
2021 (English)Report (Other academic)
Abstract [en]

In this paper we estimate the impact of line capacity utilisation on the marginal cost of rail infrastructure renewals. Previous studies are mainly concerned with deterioration costs caused by traffic. This paper contributes to the literature, showing that increased line capacity utilisation can – in addition to higher deterioration costs – generate increased costs for carrying out a renewal project and/or more frequent renewals, where the latter can be motivated by efforts to curb expected delays. A top-down econometric approach is used on a Swedish dataset comprising information on renewal costs for track, electric installations, signalling, telecommunication, and other installations such as barriers, fencing and lubrication equipment. The results are relevant for rail infrastructure managers, especially in Europe where directives by the EU stipulate that track access charges are to be based on direct costs in order to contribute to an efficient use of the infrastructure.

Place, publisher, year, edition, pages
Stockholm: VTI, 2021. p. 34
Series
Trafikverkets forskningsportföljer
National Category
Transport Systems and Logistics Economics
Research subject
FOI-portföljer, Planera
Identifiers
urn:nbn:se:trafikverket:diva-5782 (URN)
Projects
Bankapacitet och kostnadselasticitet för reinvesteringar
Funder
Swedish Transport Administration, TRV 2019/37661
Available from: 2023-02-06 Created: 2023-02-06 Last updated: 2023-02-14Bibliographically approved
Nilsson, J.-E. & Odolinski, K. (2020). When should infrastructure assets be renewed?: the economic impact of cumulative tonnes on railway infrastructure. Stockholm
Open this publication in new window or tab >>When should infrastructure assets be renewed?: the economic impact of cumulative tonnes on railway infrastructure
2020 (English)Report (Other academic)
Abstract [en]

This paper provides empirical evidence on the optimal timing of rail infrastructure renewal. Using an econometric approach on data from the Swedish railway network, we establish a relationship between cumulative tonnes and maintenance costs, as well as between cumulative tonnes and infrastructure failures that cause train delays. Together with average values on delay hours per failure and assumptions on passengers per train, we perform example calculations on the optimal timing for a track renewal. This timing will depend on the case considered, such as whether traffic intensity is high or low. Empirical evidence on the relationship between line capacity utilisation and delay time can provide more robust estimates for the different cases considered by an infrastructure manager. Still, the results in this paper is a significant step towards a usable cost-benefit analysis model for the timing of rail infrastructure renewals.

Place, publisher, year, edition, pages
Stockholm: , 2020. p. 28
Series
Trafikverkets forskningsportföljer
National Category
Economics Transport Systems and Logistics
Research subject
FOI-portföljer, Planera
Identifiers
urn:nbn:se:trafikverket:diva-5655 (URN)
Projects
Tillståndsbedömning av järnvägens infrastruktur i ett reinvesteringsperspektiv
Funder
Swedish Transport Administration, TRV 2018/67140
Available from: 2022-10-27 Created: 2022-10-27 Last updated: 2022-10-27
Odolinski, K. (2019). The impact of cumulative tonnes on track failures: an empirical approach. Stockholm: VTI
Open this publication in new window or tab >>The impact of cumulative tonnes on track failures: an empirical approach
2019 (English)Report (Other academic)
Abstract [en]

Cost-benefit analysis is often used in appraisal of rail infrastructure investments. A corresponding decision support is, however, not available for rail infrastructure maintenance and renewal. To for example decide whether to renew or continue to maintain an infrastructure asset, a relationship between cumulative traffic and infrastructure failures is required. This relationship is established in this paper, using an empirical (top-down) approach on Swedish data for years 2003 to 2016. It is shown that the average elasticity for track failures with respect to cumulative tonnes is 0.32, and that the elasticity varies for different levels of traffic and for different infrastructure characteristics. The results in this paper can for example be used to calculate the impact cumulative tonnes have on train delay costs, which together with a relationship between cumulative traffic and infrastructure maintenance costs are essential in an economic optimization of maintenance and renewal activities.

Place, publisher, year, edition, pages
Stockholm: VTI, 2019. p. 27
Series
Trafikverkets forskningsportföljer
National Category
Economics
Research subject
FOI-portföljer, Planera
Identifiers
urn:nbn:se:trafikverket:diva-5570 (URN)
Projects
Effektsamband mellan ackumulerat tonnage och felfrekvens på räl
Funder
Swedish Transport Administration, TRV 2018/9496
Available from: 2022-10-05 Created: 2022-10-05 Last updated: 2022-10-05
Organisations
Identifiers
ORCID iD: ORCID iD iconorcid.org/0000-0001-7852-403X

Search in DiVA

Show all publications